BURRANEER BAY MARINA

Client

DICK ROWE MARINE

Project

Marina Upgrade Stage 1 & 2

=

Services

  • Disconnection of existing services for new marina upgrade
  • Installation of dedicated 50mm potable water supply line throughout the marina to supply the service pedestals
  • Installation of separate 50mm poly water supply throughout the marina for the fire hose reel stand installations.
  • Installation of backflow prevention device for new marina
  • Installation of filter treatment pump system to filter clean water from hard stand and pump to rainwater tanks for re-use
  • Relocation of existing hose reels
  • Relocation of existing drainage services to suit new hard stand
  • Installation of new poly water services to travel lift to rinse salt water off cables when in use.